Construction Method: Introduction to the Neplus Method
80% reduction in concrete waste! We will proceed with repair work smoothly and quickly!
In the "Neplus Method," the development of a side cutting machine allows for the cutting and repair of only the upper part of the drainage ditch, achieving construction times that are one-third to one-fourth of traditional methods. Additionally, if the length of the repair area is around 10 meters, the work can be completed in one day, allowing for immediate lifting of traffic restrictions and minimizing the time vehicles are blocked. There are two main types of repair products: cross-sectional type and longitudinal type, which are used according to the conditions of the construction site. The Neplus Method demonstrates its effectiveness along drainage ditches that run across roads and structures such as block walls, and it is also compatible with irrigation channels, snow-melting ditches, and catch basins. 【Construction Method】 1. Installation of running rails 2. Cutting of the drainage ditch 3. Removal of concrete 4. Drilling of bolt holes 5. Injection of special adhesive 6. Installation of the upper repair product for the ditch 7. Filling with concrete 8. Tamping of pavement materials *For more details, please refer to the PDF materials or feel free to contact us. *The construction method video is currently available at the link below!
- Company:高橋土建
- Price:Other